Beschreibung
Monmouth at 6th Street
MUA contractor work completed but now the STOP line is gone.
Please have the STOP line repainted. If it’s too cold can we please have an additional STOP sign posted in the left side?
Monmouth at 6th Street
MUA contractor work completed but now the STOP line is gone.
Please have the STOP line repainted. If it’s too cold can we please have an additional STOP sign posted in the left side?
8 Kommentierens
Jersey City, NJ (Verifizierter Beamter)
Geschlossen JCMUA - Sophia (Verifizierter Beamter)
Reopened jz (Registrierter Benutzer)
JC Village Mom (Registrierter Benutzer)
JC Village Mom (Registrierter Benutzer)
Anerkannt Engineering - Althea (Verifizierter Beamter)
Engineering - Althea (Verifizierter Beamter)
Traffic – Daniella G (Verifizierter Beamter)