Description
Sewer work was completed today on Banks Ct and the trench was paved over. In the process much gravel/hot-top material is spread along the road. Construction crews indicated that town would need to be contacted to clean-up and remove the excess with a street sweeper and DPW crews. Most of the street is covered with the excess, very sticky gravel. Thanks for your attention to this.
2 Comments
Public Works (Verified Official)
Acknowledged Natalie - DPW (Verified Official)