Description
The sidewalks on this block were replaced at the beginning of March 2017. This section was never repaved; it was left as loose gravel.
The sidewalks on this block were replaced at the beginning of March 2017. This section was never repaved; it was left as loose gravel.
2 Comments
應答 DC 311 (Registered User)
關閉 DC 311 (Registered User)