Descrição
Alley between 28th and 29th St (and Clay and Leigh) was just resurfaced but there is a large section without any gravel. Hoping another load of gravel can be added in the alley to avoid the formation of deep tire tracks/trenches in the dirt.
2 Comentários
Kevin (Utilizador Registado)
Reconhecido RVA: Customer campaigner (Utilizador Registado)