Mô tả
Alley between 28th and 29th St (and Clay and Leigh) was just resurfaced but there is a large section without any gravel. Hoping another load of gravel can be added in the alley to avoid the formation of deep tire tracks/trenches in the dirt.
Alley between 28th and 29th St (and Clay and Leigh) was just resurfaced but there is a large section without any gravel. Hoping another load of gravel can be added in the alley to avoid the formation of deep tire tracks/trenches in the dirt.
2 Bình luậns
Kevin (Người dùng đã đăng ký)
Được thừa nhận RVA: Customer campaigner (Người dùng đã đăng ký)