Description
At this stop for 12/16, the construction crew installed for the new Starbucks installed a drain pipe that pours directly out above the bench at the bus stop. If anyone stands/sits under the shelter when it rains, they will get wet due to the new drain pipe.
3 Comments
Acknowledged City of Raleigh 3 (Verified Official)
City of Raleigh 3 (Verified Official)
Closed City of Raleigh 3 (Verified Official)