Firstly, wanted to thank your department for the project to resurface the roads recently in area south of 37th street from adam street to south park avenue. It appeared the work was done as planned by your department.
Unfortunately, there appears to be settlement of pavement at corner or se evans drive and se 38th street. Do not know if this is due to sewer line leaking or something else. It is close to the fire hydrant but do not believe it to be due to water leak but not sure. Would greatly appreciate if you would please investigate and plan to have that repaired when the weather becomes warm enough to do the work properly.
24 تعليقs
تم إقراره City of Topeka (تم التحقق رسميا)
City of Topeka (تم التحقق رسميا)
City of Topeka (تم التحقق رسميا)
City of Topeka (تم التحقق رسميا)
City of Topeka (تم التحقق رسميا)
City of Topeka (تم التحقق رسميا)
a (مستخدم مسجل)
I am sure your representative noticed while investigating that much of the roads that were resurfaced are cracking extensively already and believe you will have many areas that will require potholes to be repaired. It seems less than a year and is that suppose to not last that long with all that work your department planned & implemented. I am sure they do testing to make sure enough binder is utilized and applied at proper temperatures with so much expense to resurface. Well thank you again for investigating and scheduling in repairs.
City of Topeka (تم التحقق رسميا)
City of Topeka (تم التحقق رسميا)
City of Topeka (تم التحقق رسميا)
مغلق City of Topeka (تم التحقق رسميا)
فتح a (مستخدم مسجل)
تم إقراره City of Topeka (تم التحقق رسميا)
City of Topeka (تم التحقق رسميا)
a (مستخدم مسجل)
City of Topeka (تم التحقق رسميا)
City of Topeka (تم التحقق رسميا)
City of Topeka (تم التحقق رسميا)
To SCF: A work order has been issued to repair the pothole/pavement issue. The projected completion date has been updated.
The previous repair work done by the contractor is no longer under warranty. Thank you.
a (مستخدم مسجل)
I believe the subdivision is approximately 25 years old (not sure and am sure you have better records) and the major resurfacing untaken (November december 2016) and completed by your department was first major repairs to extend the life of the roads. The unfortunate part is that the older road that existed in many parts were in better condition than the new surface that is less than 2 years old. The new surface is already falling apart and it will not last certainly nothing compared to what was in the original road. It is strange that a new surface should fall apart so quickly as this should not happen to asphalt for years under oxidation (the older road are an example of this) but do not know why the new surface is falling apart and definitely will require your attention to make proper repairs again to most of the subdivision.
City of Topeka (تم التحقق رسميا)
City of Topeka (تم التحقق رسميا)
a (مستخدم مسجل)
City of Topeka (تم التحقق رسميا)
مغلق City of Topeka (تم التحقق رسميا)