This road was inspected. There will need to be a full survey, design, and funding in place to complete a full reconstruction to properly address. I have checked with utility companies to see if they will be updating their services to coordinate timing. More info to follow in later months. Thanks.
10 Comments
RRC <small class="fwn">(Verified Official)</small>
Buildings and Streets-Cynthia (Registered User)
An anonymous SeeClickFix user (Registered User)
Acknowledged Engineering - Paul R (Verified Official)
Closed RRC - Kirkland (Verified Official)
Reopened RRC - Kirkland (Verified Official)
RRC Assistant Director - Waseem (Verified Official)
Acknowledged Engineering - Althea (Verified Official)
Engineering - Althea (Verified Official)
Engineering - Althea (Verified Official)