Description
Archibald Street from No. Willard St up the hill going east, along St. Joseph's Cemetery is a MESS! It always is, every spring (and other times too). What annually happens is cold or hot pack in the deep holes and cracks (you can see all the black crack lines) - vs. what REALLY needs done is full on road repair. You did this for Germain St. last summer (or the one before). THIS road is a major thoroughfare from the New North End up to UVM/UVMMC/89. Lots of traffic. I must say, the potholes have allowed for traffic calming. :)
2 Comments
Acknowledged DPW Pine Customer Service (Verified Official)
Closed Lee Perry, Assistant Director, Maintenance Division (Verified Official)
The deeper holes have been filled with cold patch. There will be a more permanent repair when the paving season starts. 3/26/19.