الوصف
Construction behind Pho King. Construction work on Sunday. No permit posted. Construction appears to be in the root zone of the dawn redwoods.
Construction behind Pho King. Construction work on Sunday. No permit posted. Construction appears to be in the root zone of the dawn redwoods.
10 تعليقs
Decatur Public Works - J Maximuk (مستخدم مسجل)
Steve Vogel (مستخدم مسجل)
Stan (مستخدم مسجل)
Steve Vogel (مستخدم مسجل)
Decatur Public Works - A Hedgebeth (تم التحقق رسميا)
مغلق Decatur Public Works - A Hedgebeth (تم التحقق رسميا)
"Big Land Coolers" has a HVAC permit for a new Walk-in cooler but failed to obtain a Building permit for the structure. The site has been placed under a stop work order until a Building permit has been issued.
Thank you again for the post.
Decatur Public Works - K Evanovich (تم التحقق رسميا)
Stan (مستخدم مسجل)
Decatur Public Works - K Evanovich (تم التحقق رسميا)
I saw no change from the initial inspection. The project was not approved.
Stan (مستخدم مسجل)