Updated 6/12/09 9:03am: The Streets Dept has received the request
Updated 6/18/09 9:01am: The Streets Department has changed the problem type from 'Pothole repair' to 'Ditch repair'
Updated 12/2/09 11:11am: The Streets Dept reported that work will be scheduled. The inspection was completed
8 تعليقs
Philly 311 (ضيف)
hubman (ضيف)
joel palmer (ضيف)
As of Saturday August 8th, nothing has been done and this street isn't getting any better on its own.
PWD is responsible for the fix; possibly Street Department as well
Anonymous (ضيف)
CT Livable Streets Campaign (مستخدم مسجل)
JP (ضيف)
CT Livable Streets Campaign (مستخدم مسجل)
مغلق Philly311 (مستخدم مسجل)
Updated 6/18/09 9:01am: The Streets Department has changed the problem type from 'Pothole repair' to 'Ditch repair'
Updated 12/2/09 11:11am: The Streets Dept reported that work will be scheduled. The inspection was completed