说明
Excessive speeding on High Ridge and throughout the surrounding neighborhood, especially high Ridge, Rosemar, Normandy, and church lane. There are no speed bumps, very few speed signs, no traffic calming and no sidewalks. Cars cut through to avoid shopping center traffic lights and now the construction on 99 has even more people cutting through so traffic continues to increase. There are multiple businesses as well as the arts center/head start school whose employees and families walk to work/school in the neighborhood. In addition, kids walk and wait at bus stops in the street and families try to get out to go for walks and bike rides. I hope something is done before someone is killed.
13 评论s
Howard County Admin II (官方验证)
DPW Traffic Diane B (官方验证)
已确认 DPW Traffic Diane B (官方验证)
Buck B (注册用户)
Sidewalk Requests need to be directed to:
Brandon N. Love, Chief
7125 Riverwood Drive, Suite B
Columbia, MD 21046
(410) 313-2014
https://www.howardcountymd.gov/Departments/Public-Works/Bureau-Of-Engineering/Transportation-and-Special-Projects
Buck B (注册用户)
Traffic Division will review signs, markings and speeding. Hump installation must meet requirements of Community Speed Control Program.
https://www.howardcountymd.gov/Departments/Public-Works/Bureau-Of-Highways/Divisions/Traffic-Engineering-Division/Community-Speed-Control-Program
Speed/Volume study will be done during the school year.
Elb12345 (注册用户)
Emily Irish (注册用户)
spud050996 (注册用户)
Buck B (注册用户)
Buck B (注册用户)
SPEED STUDY RESULTS
8416 High Ridge Rd
North Bound
Avg Speed = 20 MPH
Operating Speed (85th%ile) = 32 MPH
#Exceeding 35MPH = 30 per Day
Traffic Volume = 326 Veh per Day
South Bound
Avg Speed = 17 MPH
Operating Speed (85th%ile) = 29 MPH
#Exceeding 35MPH = 6 per Day
Traffic Volume = 424 Veh per Day
Total (N+S) Traffic Volume = 750 Veh per Day
Elb12345 (注册用户)
Buck B (注册用户)
Speed Study Results
8406 Church Lane Rd
East Bound
Avg Speed = 24 MPH
Operating Speed (85th%ile) = 31 MPH
#Exceeding 35MPH = 12 per day
Traffic Volume = 366 Veh per Day
West Bound
Avg Speed = 26 MPH
Operating Speed (85th%ile) = 32 MPH
#Exceeding 35 MPH = 21 per Day
Traffic Volume = 542 Veh per Day
Total (N+S) Traffic Volume = 907 Veh per Day
关闭 Buck B (注册用户)