Public Works Construction Project 打开

1-29 Franconia Ave Natick, MA, 01760, USA 在地图上显示 隐藏地图
Move the marker to represent your issue's location. The address will not change.

报告人

问题 ID:

6938987

Submitted To:

Natick, MA

类别:

Public Works Construction Project

已查看:

320 次数

社区:

Natick

已报告:


说明

Since this summer the residents of Franconia Ave. have received multiple letters from the Natick DPW stating that the contractor working for the DPW, P.J. Keating would be installing a new street and sidewalks. The last letter received was dated 10/10/19 and the street has been paved but our driveways are still far below the grade of the street. The sidewalks were never completed and there’s a pile of curb stones blocking the sidewalk across the street of 28 Franconia Ave.

With winter and snow fast approaching this poses a major safety problem for plows, snowblowers and just walking in general since you can’t tell where the drop off is underfoot. I’ve tried calling the Town Engineering Division's phone number that’s advised on the DPW letter and it always goes to voicemail. I have even called the contractor, P.J. Keating but have only received a lot of empty promises. When will this project be done? Thank you.

还问了...
Please provide a description of your inquiry related to an ongoing Natick Public Works Construction Project.
Project poses major safety issue.
Please provide the location of the project (nearest roadway intersection and street address).
15 Franconia Avenue

发表新评论

18 评论s

  • DPW (官方验证)

  • Town Engineer (官方验证)

  • Car Guy (注册用户)

  • Wayne Szretter (注册用户)

  • Town Engineer (官方验证)

  • Car Guy (注册用户)

  • Car Guy (注册用户)

  • Car Guy (注册用户)

  • Wayne Szretter (注册用户)

  • Car Guy (注册用户)

  • Car Guy (注册用户)

  • Car Guy (注册用户)

  • Car Guy (注册用户)

新评论

我想...