Description
The roadway has settled on the western edge of the bridge on Coach Lantern and the transition from roadway to bridge needs to be filled/repaired. This is a road hazard for eastbound traffic where the road is below the grade of the bridge.
8 Comments
Wake Forest, NC (Verified Official)
Public Works - T Bailey (Verified Official)
Closed Engineering - JJ (Registered User)
Reopened BrianC (Registered User)
Engineering - JJ (Registered User)
BrianC (Registered User)
Thanks for the quick reply. I guess whoever sets that standard must drive a Jeep Rubicon or similar!
Is there a month target for completing the assessment?
Closed Engineering - JJ (Registered User)
BrianC (Registered User)