الوصف
After the construction was completed on Walnut, the pedestrian signal and traffic light was removed. This a dangerous for both autos and pedestrians. This is a very busy intersection, especially during 8am and 4pm.
After the construction was completed on Walnut, the pedestrian signal and traffic light was removed. This a dangerous for both autos and pedestrians. This is a very busy intersection, especially during 8am and 4pm.
2 تعليقs
City of Canton IT Department_2 (مستخدم مسجل)
مغلق Traffic Engineering (تم التحقق رسميا)