说明
Morgan Street was repaved months ago. Central lane striping and driveway / parking striping has still not been done.
还问了...
问 Please select the issue:
答 3. Traffic: Roadway Striping Maintenance (For all requests to refresh faded roadway striping, including crosswalks, double yellow centerlines, stop bars and markings, lane arrows, etc. Requests are typically addressed within 3 to 6 months.
答 3. Traffic: Roadway Striping Maintenance (For all requests to refresh faded roadway striping, including crosswalks, double yellow centerlines, stop bars and markings, lane arrows, etc. Requests are typically addressed within 3 to 6 months.
问 Additional Information
答 没有给出答案
答 没有给出答案
4 评论s
Jersey City, NJ (官方验证)
已确认 Traffic – Jennifer C (官方验证)
Traffic – Jennifer C (官方验证)
关闭 Engineering – Billy C (官方验证)