Description
UI began work on Court Street at 5:30 a.m. It was my understanding that there are rules about how early loud street work can begin. They had bright lights and loud vehicles that made loud sounds. It woke me up and I'm certain the entire street. I'm not sure why they couldn't begin at 8:00 a.m. when most folks are up. Perhaps it was an emergency so please advise.
2 Comments
LCI Citywide Helper (Verified Official)
We suspect it must have been an emergency. It is quite doubtful that the various City Departments would approve their work plan to begin at 5AM!
Please let us know if this happens again.....see below.....
ARTICLE II. NOISE CONTROL
Sec. 18-71. Title.
Sec. 18-78. Exemptions and special conditions
The following shall be exempt from these regulations, subject to special conditions as provided herein:
(1) Noise generated by any construction equipment which is operated between the hours of 7:00 a.m. and 10:00 p.m. on Mondays through Saturdays, and 9:00 a.m. and 9:00 p.m. on Sundays. The building official or the director of the department of public works must approve the operation of the same during hours other than those allowed by this section. The person requesting such approval must apply for it at least seven (7) days before the date for which approval is sought. Approval may be granted if the requesting person makes an advanced payment for the actual cost of such inspection services as may be required under applicable rules and regulations as amended from time to time;
(2) Noise created as a result of or relating to an emergency;
(3) Noise from domestic power equipment such as, but not limited to, power saws, sanders, grinders, lawn and garden tools or similar devices operated between the hours of 7:00 a.m. and 10:00 p.m. on Mondays through Saturdays, and 9:00 a.m. and 9:00 p.m. on Sundays, provided that noise discharged from exhaust is reasonably muffled;
(4) Noise from snow removal equipment, provided it is maintained in good repair and exhaust is reasonably muffled;
(5) Noise from demolition work conducted between the hours of 7:00 a.m. and 10:00 p.m. on Mondays through Saturdays, and 9:00 a.m. and 9:00 p.m. on Sundays, provided that demolition shall be exempted at all times from the noise levels set in this regulation when it is considered emergency work;
(6) Noise created by any aircraft flight operations, which the Federal Aviation Administration specifically preempts;
(7) Noise created by any lawful recreational activities, and for which the city has granted a license or permit, including but not limited to parades, sporting events, outdoor concerts, firework displays and non-amplified religious activities;
(8) Noise involving blasting other than that conducted in connection with construction or demolition activities, provided that the blasting is conducted between the hours of 7:00 a.m. and 10:00 p.m. on Mondays through Saturdays, and 9:00 a.m. and 9:00 p.m. on Sundays, at specified hours previously announced to the local public, or provided that a permit for such blasting has been obtained from local authorities;
(9) Noise created by products undergoing tests, where one (1) of the primary purposes of the test is to evaluate product noise characteristics, and where practical noise control measures have been taken;
(10) Noise generated by transmission facilities, distribution facilities and substations of public utilities providing electrical power, telephone, cable television or other similar services, and located on property which is not owned by the public utility, and which may or may not be within utility easements
(g) Daytime hours means the hours between 7:00 a.m. and 10:00 p.m. Mondays through Saturdays, and the hours of 9:00 a.m. through 9:00 p.m. Sundays and federal and state holidays. Unless otherwise provided, all other hours shall be construed as nighttime hours