Description
We have been asking for sidewalk repairs fot4 yearsMather StreetWhas high gh pedest ia-u area, antheor sidewalk disrepair is hazardo. Today a young child fell from their bike over the uneven pavemen I would appreciate a specific date when we can expect these repair. As the town tree roots grow, and winters freeze and thaw, the situatioworsensnse. Respectfully, Lynne Fontes t.joy
9 Comments
Hamden, CT (Verified Official)
Fontes (Registered User)
Acknowledged Staff Engineer (Verified Official)
Fontes (Registered User)
Engineering Inspector (Verified Official)
Fontes (Registered User)
Staff Engineer (Verified Official)
We attempt to give 48 to 72 hours notice when we can. I tis unlikely the work will be done this calendar year, due to temperature constraints.
Good luck with your new windows.
Fontes (Registered User)
Closed Engineering Inspector (Verified Official)