الوصف
There are 3 sewer on this corner They are all clogged and the area floods with every rain It was an ice rink all winter Heavy rains cause overflow into my basement, probably because marble Ave was skipped in the storm/sewer Hampden st project
There are 3 sewer on this corner They are all clogged and the area floods with every rain It was an ice rink all winter Heavy rains cause overflow into my basement, probably because marble Ave was skipped in the storm/sewer Hampden st project
6 تعليقs
Chicopee, MA (تم التحقق رسميا)
M C (تم التحقق رسميا)
Kapusta (مستخدم مسجل)
Doug Ellis (تم التحقق رسميا)
Doug Ellis (تم التحقق رسميا)
تم إقراره Quinn Lonczak, Project Supervisor (تم التحقق رسميا)