Description
Is there a schedule or timetable to add a lane (widen) E/B Ocotillo Rd between 148th Street and Val Vista? The former agriculture field on the south side of Ocotillo has been graded for roads and residential. There are power poles that need to be moved before a curb lane, bicycle lane and sidewalk can be completed. Any estimate will help. Thanks
4 Commentaires
Gilbert 311 (Membre officiel vérifié)
Engineering - Debbie 🚦 (Membre officiel vérifié)
Gilbert 311 (Membre officiel vérifié)
Engineering - Tom (Membre officiel vérifié)