Fake construction signs block water access La Kaydiiyey

386 Kimberly Ave New Haven, Connecticut Ka Muuji Khariidadda Qari Khariidadda
Move the marker to represent your issue's location. The address will not change.

Wariyaha

Bixi Aqoonsiga:

1382401

Submitted To:

New Haven

Category:

Other - city responsibility

Arkay:

8404 jeer

Xaafadda:

City Point

La sheegay iyadoo la adeegsanayo:

mobile application

La sheegay:

kusaabsan/saaran

Sharraxaadda

No construction permits visible and no sign of construction in progress (except the signs). Public access to water blocked. Behind Harbor Landing Condos.

The reason I'm reporting this is because I believe this is fake construction designed solely to block the public water access behind the Harbor Close condos. The reason I think it is fake is because the "construction site" doesn't begin where the actual damaged boardwalk is -- but conveniently starts where the Harbor Condo water view begins. You can see in the photo below that there is at least another 30 feet of boardwalk that is walkable until the damage begins.

Today's date is Nov 30, 2014. If there was a permit, we would have a date by which the construction is set to complete.

I would be thrilled if Harbor Landing actually fixed this issue which is now 2 years+ standing. But if they have the wood to put up a sign, they should actually fix the boardwalk.


5 Faalladas

Faallooyinku waxay u xidhan yihiin arrimaha kaydsan.