Description
The sidewalk was redone with concrete.
A tree hole was cut out.
Then months later the tree hole was filled with asphalt.
1) Is this the final outcome part concrete and part asphalt? If so the town needs a better engineer.
2) If the asphalt will be removed and a tree planted - when will this be done?
3) If we had known the hole was to be filled with asphalt we would have planted flowers.
4) This degrades the Town of Malden and looks like town officials have no clue as to what they are doing.