Other Issue/Concern Ouvert

5601 Bay St Emeryville CA 94608, United States Montrer sur la carte Masquer la carte
Move the marker to represent your issue's location. The address will not change.

Reporter

ID du Problème:

15478745

Submitted To:

City of Emeryville

Catégorie:

Other Issue/Concern

Vues:

63 fois

Quartier:

Emeryville

A signalé:

le

Description

northbound Shellmound between Bay and Ohlone Way - the construction site on the east side of the street has closed the pedestrian sidewalk, and has put plywoodon the ground halfway across the bike lanecreating a significant lip in the middle of the bikeway.

I don't know if this construction impact was approved, but a better approach would be to convert one of the two northbound car travel lanes here to retain both the pedestrian sidewalk and the bike lane throughout constructio - the temp pedestrian path should have accessible ramps and solid barrier protection along the outside so as to be navigable by people with disabilities - the plywood in the bike lane also needs to be addressed

Ideally these should be standard treatments Emeryville requires for every development project , to prioritize continuous, safe and accessible bike/walk access throughou constructiont


Post a New Comment

4 Commentaires

Nouveau commentaire

Je veux...