Mô tả
The sign is not down. But the construction complete for a month or two. The sign should be taken down.
cũng đã hỏi...
Hỏi. What type of sign is it?
Đáp. Other
Đáp. Other
Hỏi. Please describe where the sign is mounted.
Đáp. Between the street and the sidewalk
Đáp. Between the street and the sidewalk
Hỏi. Please describe the type of sign.
Đáp. Construction
Đáp. Construction
Hỏi. Where is the sign mounted?
Đáp. On a Pole
Đáp. On a Pole
2 Bình luậns
Được thừa nhận City of Raleigh 3 (Chính thức đã xác nhận)
Đã đóng City of Raleigh 3 (Chính thức đã xác nhận)