Opis
At 2:30 pm Monday (12/21/15), the signal at Grove and College/Prospect went through three full cycles of vehicle traffic in each direction after the pedestrian button was pushed before switching to the pedestrian crossing phase. It wasn't clear why - the button had been pushed on multiple corners (I was on the SW), and vehicle traffic was light.
3 Skomentujs
Potwierdzone Department of Transportation, Traffic and Parking (Zarejestrowany użytkownik)
TT&P Workflow Inegration (Verified Official)
Zamknięte TT&P Workflow Inegration (Verified Official)