Description
When will the roadwork stop and the repaving begin? This has gotten beyond annoying. The workers regularly block my driveway and use my outside faucet.
When will the roadwork stop and the repaving begin? This has gotten beyond annoying. The workers regularly block my driveway and use my outside faucet.
7 Commentaires
Webmaster (Utilisateur inscrit)
Reconnu Webmaster (Utilisateur inscrit)
Webmaster (Utilisateur inscrit)
Town Engineer (Membre officiel vérifié)
This has extended the anticipated construction period allotted for the initial sewer work during this season and we understand your frustration.
Eversource has been instructed to ensure that driveways are not blocked by vehicles. They will be reminded of this requirement. The contractor is not allowed to use individual outdoor faucets. The Engineering Division will speak with the contractor and the site superintendent immediately regarding this matter.
SMS (Utilisateur inscrit)
SMS (Utilisateur inscrit)
Clos Public Works Director (Membre officiel vérifié)