Description
When will the roadwork stop and the repaving begin? This has gotten beyond annoying. The workers regularly block my driveway and use my outside faucet.
When will the roadwork stop and the repaving begin? This has gotten beyond annoying. The workers regularly block my driveway and use my outside faucet.
7 Comments
Webmaster (Registered User)
Godkänd Webmaster (Registered User)
Webmaster (Registered User)
Town Engineer (Verified Official)
This has extended the anticipated construction period allotted for the initial sewer work during this season and we understand your frustration.
Eversource has been instructed to ensure that driveways are not blocked by vehicles. They will be reminded of this requirement. The contractor is not allowed to use individual outdoor faucets. The Engineering Division will speak with the contractor and the site superintendent immediately regarding this matter.
SMS (Registered User)
SMS (Registered User)
Stängt Public Works Director (Verified Official)