Road Construction تم حفظه في الأرشيف

تحريك علامة لتمثيل موقع القضية الخاص بك. سوف عنوان لا يتغير.

مراسل صحفي

ID قضية:

4417704

Submitted To:

Town of Enfield

فئة:

Road Construction

شاهدوا:

441 مرات

حي:

polytest

ذكرت عبر:

https://www.enfield-ct.gov

ذكرت:

في

الوصف

The construction on Mullen road is the biggest waste of tax money. In 2017 Spazzarini construction took roughly 10 months to to repave mullen road and widen it. That was supposed to be the entire thing. Now, for the past two months they ripped up the beginning of the road. They have been digging up and replacing old dirt with new dirt. They have done the same areas multiple times. This is an abuse of tax dollars, please get this thing under control.


3 تعليقs

التعليقات مغلقة لقضايا المؤرشفة.