Beschreibung
The construction on Mullen road is the biggest waste of tax money. In 2017 Spazzarini construction took roughly 10 months to to repave mullen road and widen it. That was supposed to be the entire thing. Now, for the past two months they ripped up the beginning of the road. They have been digging up and replacing old dirt with new dirt. They have done the same areas multiple times. This is an abuse of tax dollars, please get this thing under control.
3 Kommentierens
kelly lamprecht (Registrierter Benutzer)
Joan (Registrierter Benutzer)
Geschlossen Maya N. Matthews (Registrierter Benutzer)