Cross walk needs repainting تم حفظه في الأرشيف

343 Congress Street Boston, Massachusetts عرض على الخريطة إخفاء الخريطة
تحريك علامة لتمثيل موقع القضية الخاص بك. سوف عنوان لا يتغير.

مراسل صحفي

ID قضية:

4668974

Submitted To:

Boston 311

فئة:

Traffic Signal

شاهدوا:

220 مرات

حي:

South Boston

ذكرت:

في

خدمة طلب ID:

101002561172

خدمة طلب ID:

101002560235

الوصف

Previous report in May:
Issue ID: 4480923
Service Request ID: 101002486320
You reported to me that there was no crosswalk repainted yet because "As part of the construction of the new building, the developer has agreed to install a new pedestrian ramp on both sides of the street. No crosswalk can be installed until the new pedestrian ramps are installed." People are living in the new building. Construction is done. What City Department is responsible for making developer finish the pedestrian ramps? Thank you.

سئل أيضا...
Q. Type of Signal
A. Pedestrian Signal
Q. Type of Problem
A. Other

قضايا القريبة

7 تعليقs

التعليقات مغلقة لقضايا المؤرشفة.