Beschreibung
This is the second time national grid is doing night work and ripping up the street. The last time lasted until 5am. Can they at least notify the residents of the affected area ahead of time?!
This is the second time national grid is doing night work and ripping up the street. The last time lasted until 5am. Can they at least notify the residents of the affected area ahead of time?!
2 Kommentierens
City of Malden (Verifizierter Beamter)
Geschlossen Robert P. Knox Jr. (Director of Public Works) (Verifizierter Beamter)
The only work NG is being able to do now is emergency work Grade 1 leaks. They do not notify for emergency work
Thanks
Bob