Description
Attn: Traffic & Engineering.
After construction on Marin between Columbus and Steuben was completed, the parking signage was never replaced. Multiple cars park free, and without resident permit, all day / all night
Attn: Traffic & Engineering.
After construction on Marin between Columbus and Steuben was completed, the parking signage was never replaced. Multiple cars park free, and without resident permit, all day / all night
5 Commentaires
RRC <small class="fwn">(Membre officiel vérifié)</small>
Ivette (Membre officiel vérifié)
Ivette (Membre officiel vérifié)
Reconnu Traffic – Daniella G (Membre officiel vérifié)
Clos Traffic – Daniella G (Membre officiel vérifié)