说明
Broken street parking sign. The metal sign is overhanging the sidewalk and the pole is clearly bent.
还问了...
问 Please select the issue:
答 2. Traffic: Street Signage Maintenance (For all requests for new sign installations, replacements, corrections, relocations, and removals. Requests are typically addressed within 1 to 2 months.)
答 2. Traffic: Street Signage Maintenance (For all requests for new sign installations, replacements, corrections, relocations, and removals. Requests are typically addressed within 1 to 2 months.)
问 Additional Information
答 没有给出答案
答 没有给出答案
5 评论s
RRC <small class="fwn">(官方验证)</small>
Traffic – Jennifer C (官方验证)
Traffic – Jennifer C (官方验证)
已确认 Traffic – Daniella G (官方验证)
关闭 Traffic – Daniella G (官方验证)