Descrição
The short piece of pavement from 9P onto the N'way ramp is extremely uneven. When the ramp was repaved, this piece was never done. Concrete underlay needs to be leveled and the piece repaved.
Solicitante
The short piece of pavement from 9P onto the N'way ramp is extremely uneven. When the ramp was repaved, this piece was never done. Concrete underlay needs to be leveled and the piece repaved.
2 Comentários
billandpeg2 (Utilizador Registado)
Encerradas billandpeg2 (Utilizador Registado)