Mô tả
Since putting new water lines on Shore Road and King Street
the roads were improved. Winter has taken a toll on the repairs.
We were told the roads would be resurfaced in the Spring.
Any idea when this will happen?
Người báo cáo
Since putting new water lines on Shore Road and King Street
the roads were improved. Winter has taken a toll on the repairs.
We were told the roads would be resurfaced in the Spring.
Any idea when this will happen?
8 Bình luậns
Được thừa nhận DPW (Chính thức đã xác nhận)
Đã đóng DPW (Chính thức đã xác nhận)
Reopened jaw1351 (Người dùng đã đăng ký)
Sweetwater Street has not been repaved in a very long time. I believe it was suppose to be repaved a few years ago when other roads in this area were being resurfaced but it was not.
jaw1351 (Người dùng đã đăng ký)
paved? This section is a mess!!
I thought the entire street would be fixed.
Đã đóng DPW (Chính thức đã xác nhận)
Reopened jaw1351 (Người dùng đã đăng ký)
Được thừa nhận DPW (Chính thức đã xác nhận)
Đã đóng DPW (Chính thức đã xác nhận)