说明
Since putting new water lines on Shore Road and King Street
the roads were improved. Winter has taken a toll on the repairs.
We were told the roads would be resurfaced in the Spring.
Any idea when this will happen?
报告人
Since putting new water lines on Shore Road and King Street
the roads were improved. Winter has taken a toll on the repairs.
We were told the roads would be resurfaced in the Spring.
Any idea when this will happen?
8 评论s
已确认 DPW (官方验证)
关闭 DPW (官方验证)
Reopened jaw1351 (注册用户)
Sweetwater Street has not been repaved in a very long time. I believe it was suppose to be repaved a few years ago when other roads in this area were being resurfaced but it was not.
jaw1351 (注册用户)
paved? This section is a mess!!
I thought the entire street would be fixed.
关闭 DPW (官方验证)
Reopened jaw1351 (注册用户)
已确认 DPW (官方验证)
关闭 DPW (官方验证)