The Engineering Department re-inspected the site on 9/15/2021. We have determined that the sidewalk, walkout, and driveway apron do need to be repaired/replaced. Based on current funding, we do not have a good estimate on when the replacement will be conducted. The town is investigating the replacement of all sidewalks on both sides of the street for 4th Street. The site has been added to our master list for repairs.