Description
Since this was still not fixed my father has hurt his back. We had to spray paint it so people can see the hazard. It was acknowledged and accepted for repair 9 months ago? Hamden needs to do better. I will be contacting other resources since it is not be taken care of.
7 Comments
Hamden, CT (Verified Official)
TERRAPIN (Registered User)
Cristina (Registered User)
Engineering Inspector (Verified Official)
Original Reply on 10/14/2021 SCF #11126622:
The Engineering Department re-inspected the site on 9/22/2021. Based on our inspection of the condition of the sidewalk, this site has been elevated to our CLAIMS list. We have determined that the sidewalk, and driveway aprons do need to be replaced. Based on current funding, we do not have a good estimate on when the replacement will be conducted, nevertheless, this area must be corrected. MGK
Current Situation on 6/7/2022 SCF #12515901:
Based on current funding, we do not have a good estimate on when the replacement will be conducted, nevertheless, this area must be corrected. IF the current plan is realized ($) your sidewalk areas will be replaced in 2022, as I had prioritized this address to be completed. MGK
Engineering Inspector (Verified Official)
Acknowledged Engineering Inspector (Verified Official)
Engineering Inspector (Verified Official)