Ridge between Newly laid asphalt and existing asphalt Archivé

186 Crest Avenue Revere, Massachusetts Montrer sur la carte Masquer la carte
Move the marker to represent your issue's location. The address will not change.

Reporter

ID du Problème:

1325198

Submitted To:

City of Revere

Catégorie:

Other

Vues:

669 fois

Quartier:

Revere

A signalé:

le

Description

Between 186 and 188 Crest there is a ridge between the asphalt that was laid down on 15-October, and that which was laid down a few weeks ago along the edge of the road. The asphalt was either not compressed enough to join the edges together or there was not enough asphalt used to smooth this joint out. The job needs to be finished correctly.


4 Commentaires