Opis
The street is about 30% new the other part is very old and damaged theirs a lot of high traffic/walkers because of the school at the corner.
The street is about 30% new the other part is very old and damaged theirs a lot of high traffic/walkers because of the school at the corner.
3 Skomentujs
Hamden, CT (Verified Official)
Engineering Inspector (Verified Official)
Potwierdzone Engineering Inspector (Verified Official)