Traffic Signals تم حفظه في الأرشيف

1000-1098 Saint Joseph Parkway Houston, Texas عرض على الخريطة إخفاء الخريطة
تحريك علامة لتمثيل موقع القضية الخاص بك. سوف عنوان لا يتغير.

مراسل صحفي

(ضيف)

ID قضية:

1480207

Submitted To:

City of Houston

فئة:

Traffic Signals

شاهدوا:

110 مرات

حي:

Downtown

ذكرت عبر:

http://skyscrapershadows.org

ذكرت:

في

خدمة طلب ID:

61038

الوصف

The Metro-Rail has been taking two to three light cycles to allow traffic to cross. This has been causing northbound traffic to go on green light at Fannin, only to be caught in the middle of the intersection for an additional cycle because Main street is still on RED, then backing up soutbound Fanning traffic.
At the point in which Main finally turns green, the pedestrian signal is now for pedestrians to cross at fannin (where cars are blocking), and they begin walking, while vehicles are trying to go on their green and to get out of their crosswalk and of the oncoming Fannin traffic. Pedestrians were crossing around vehicles trying to go, nearly being struck.

The lights need to be better coordinated with the metro-rail. And if the metro rail is delayed in boarding/de-boarding, it should surrender to cross-traffic flow. This happens on all downtown streets crossing metro.

سئل أيضا...
Q. What is your area of concern?
A. Timing - Traffic Signals.
Q. Why is this a concern?
A. Uncoordinated lighting and Metro-Rail causing vehicular and pedestrian hazards
Q. Problem occurs at what time of day?
A. 6am-9am
Q. What direction were you traveling?
A. North

2 تعليقs

التعليقات مغلقة لقضايا المؤرشفة.