الوصف
The street and sidewalks were opened up in April to replace lead water piping. They were temporarily patched but the company never returned to mill and overlay the entire road as the contractor said they would. Once we get into winter, the street is going to turn into a pothole nightmare when the patches get damaged by plows and freeze thaw. Some of the granite curbs were also left askew and misaligned leaving potential for car damage issues when parking. Finally, the asphalt patches on the concrete sidewalks were done in a very temporary method, so I would like to know when these will be permanently repaired with replacement segments of concrete for the segments that were saw-cut through. I know the state approved $200M for reconstruction and maintenance of municipal roads so this would be a great place to apply a little bit of that.
5 تعليقs
Malden, MA (تم التحقق رسميا)
Robert P. Knox Jr. (Director of Public Works) (تم التحقق رسميا)
Malden, MA (تم التحقق رسميا)
An anonymous SeeClickFix user (مستخدم مسجل)
An anonymous SeeClickFix user (مستخدم مسجل)