说明
Still not fixed. Was told contractor was notified but nothing became of it. Please advise!
Background: JC MUA performed lead water line test/replacement on entire block but broke or left the cast iron water line access opening full detached after the work was completed. This opening should have been screwed and closed shut to prevent exposing the line to further damage from pedestrians, inclement weather as well as potentially being trip hazard. Please rectify ASAP. Thank you!
还问了...
问 Is this for a catch basin / inlet? If so, proceed.
If not, please use a different category, such as sidewalk defect.
答 No
答 No
4 评论s
Jersey City, NJ (官方验证)
已确认 Jersey City, NJ (官方验证)
null (注册用户)
JCMUA - Sophia (官方验证)