Description
Utilities have had the sidewalk dug up for months, and now decide to asphalt the sidewalk, in an area that should be cemented. This is unacceptable.
Utilities have had the sidewalk dug up for months, and now decide to asphalt the sidewalk, in an area that should be cemented. This is unacceptable.
6 Commentaires
Malden, MA (Membre officiel vérifié)
Robert P. Knox Jr. (Director of Public Works) (Membre officiel vérifié)
Rob Hannafin (Utilisateur inscrit)
Yem Lip (Director of Engineering) (Membre officiel vérifié)
Clos Yem Lip (Director of Engineering) (Membre officiel vérifié)
Rob Hannafin (Utilisateur inscrit)