Utilities have had the sidewalk dug up for months, and now decide to asphalt the sidewalk, in an area that should be cemented. This is unacceptable.
Utilities have had the sidewalk dug up for months, and now decide to asphalt the sidewalk, in an area that should be cemented. This is unacceptable.
6 Commentos
Malden, MA (Ufficialità verificata)
Robert P. Knox Jr. (Director of Public Works) (Ufficialità verificata)
Rob Hannafin (Utente registrato)
Yem Lip (Director of Engineering) (Ufficialità verificata)
Chiusa Yem Lip (Director of Engineering) (Ufficialità verificata)
Rob Hannafin (Utente registrato)