The sidewalk on the East side of North Ave from the exit to Hunt Middle school going south towards downtown is disintegrating. Has it been scheduled to be replaced? During the winter, it fills with ice and is sometimes impassable.
还问了...
问 Problem with sidewalks:
答 Cracked/broken/ heaved surface
答 Cracked/broken/ heaved surface
7 评论s
IT Department (官方验证)
已确认 SCormier (官方验证)
关闭 SCormier (官方验证)
Reopened Burlingtonian (注册用户)
已确认 SCormier (官方验证)
SCormier (官方验证)
关闭 DPW Engineering LW (官方验证)
Work Completed 2021
The Department of Public Works has resolved this request. Thanks for helping to keep Burlington a great place to live and work.