Thank you for reporting the site to the Town. We will be dispatching our inspector to the site to evaluate the sidewalk. Please allow us up to two weeks to conduct the inspection.
Based on our inspection of the condition of the sidewalk, this site has been elevated to our claims list. Our contractors are currently on other job sites. We are scheduling the site as our on call contractors become available and we work through the claims list. Please be aware we schedule our claims list on a triage basis and handle the worst first.
4 评论s
Staff Engineer (官方验证)
已确认 Staff Engineer (官方验证)
Staff Engineer (官方验证)
Engineering Inspector (注册用户)