The issue is not with the staging. Typically there are staff present who are directing car traffic and pedestrians when there is a lot of truck traffic at the site. Yesterday a whole lane of traffic was occupied for two blocks but there was no staff present to direct cars and pedestrians to keep them safe. That is the reason I posted.
8 评论s
RRC <small class="fwn">(官方验证)</small>
Neil D. (注册用户)
continues after the crossing too. About 10 trucks at least total.
已确认 Construction Code Official (官方验证)
Neil D. (注册用户)
RRC Assistant Director - Waseem (官方验证)
RRC Assistant Director - Waseem (官方验证)
Engineering - Jeremy (官方验证)
关闭 RRC Assistant Director - Waseem (官方验证)