The issue is not with the staging. Typically there are staff present who are directing car traffic and pedestrians when there is a lot of truck traffic at the site. Yesterday a whole lane of traffic was occupied for two blocks but there was no staff present to direct cars and pedestrians to keep them safe. That is the reason I posted.
8 Commentaires
RRC <small class="fwn">(Membre officiel vérifié)</small>
Neil D. (Utilisateur inscrit)
continues after the crossing too. About 10 trucks at least total.
Reconnu Construction Code Official (Membre officiel vérifié)
Neil D. (Utilisateur inscrit)
RRC Assistant Director - Waseem (Membre officiel vérifié)
RRC Assistant Director - Waseem (Membre officiel vérifié)
Engineering - Jeremy (Membre officiel vérifié)
Clos RRC Assistant Director - Waseem (Membre officiel vérifié)