الوصف
The sidewalk was destroyed and replaced with temporary gravel fill in June 2019. This street is a direct pedestrian connection to Brookrun Park. Strollers, wheelchairs and bikes can now not safely use the sidewalk in this section so they are continuously in the street.
3 تعليقs
تم إقراره Dunwoody Public Works (تم التحقق رسميا)
Dunwoody Public Works (تم التحقق رسميا)
مغلق Dunwoody Public Works (تم التحقق رسميا)